The Queensland Government appointed BrisConnections to deliver the Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade Projects.
BrisConnections is listed on the ASX and will design, construct, operate, maintain and finance Airport Link for a period of 45 years. BrisConnections will also deliver the Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade projects, which will be handed back to the State upon completion.
Thiess John Holland, a joint venture between Thiess and John Holland Group, has been contracted by BrisConnections to design and construct the projects.
Thiess John Holland Services, a joint venture between Thiess Services and John Holland Services, will operate and maintain the toll road on completion.
Airport Link and Northern Busway (Windsor to Kedron) are scheduled for completion on 30 June 2012, with all elements of the Airport Roundabout Upgrade project completed in February 2011, 9 months ahead of schedule.
Both the design and construction elements of the Airport Link and Northern Busway (Windsor to Kedron) projects are on schedule for completion on 30 June 2012. The Airport Roundabout Upgrade was completed 9 months ahead of schedule in February 2011.
Under a Public-Private Partnership (PPP) BrisConnections will finance, design, construct, commission, operate and maintain Airport Link for a period of 45 years.
BrisConnections will also deliver the Windsor to Kedron section of the State-funded Northern Busway and the Airport Roundabout Upgrade, before handing it back to the State to operate and maintain.
A Public-Private Partnership (PPP) is a contractual arrangement between Government and the private sector which harnesses the skills and capability of the private sector in designing, constructing, operating, maintaining and financing major infrastructure projects.
One of the key characteristics of a PPP is that the Government maintains control of the infrastructure by monitoring the private sector's performance.
None. The Queensland Government has been assured that BrisConnections will meet its obligations to design and construct Airport Link, Northern Busway (Windsor to Kedron) and the Airport Roundabout Upgrade.
The project is fully funded - and underwritten by Macquarie Capital Advisers and Deutsche Bank - and this remains the case.
Airport Link will be the first major motorway linking Brisbane city to the northern suburbs and airport precinct, avoiding up to 18 sets of lights.
Airport Link is a 6.7km free-flow toll road, mainly underground, connecting the Clem 7 Tunnel, Inner City Bypass and local road network at Bowen Hills, to the northern arterials of Gympie Road and Stafford Road at Kedron, Sandgate Road and the East West Arterial leading to the airport.
Entry and exit points for the Airport Link tunnel will be located at:
Toombul - East West Arterial and Sandgate Roads
Kedron - Gympie and Stafford Roads
Bowen Hills – Bowen Bridge Road, Inner City Bypass, Clem 7, Campbell Street
BrisConnections has set the tolls at 2006 dollar prices and they will be indexed in line with Brisbane CPI. The tolls for cars per trip, applicable in 2006 dollars, are:
The maximum car toll payable is $4.00 in 2006 dollars. Different tolls apply for light and heavy commercial vehicles.
For more information on the operation of Airport Link including tolling CLICK HERE.
Yes. Electronic free-flow tolling will be introduced for all Queensland toll roads and Airport Link tags will be fully interoperable with other Australian toll roads.
The Northern Busway will be a two-lane, two-way road for buses only, connecting the Inner Northern Busway at the Royal Brisbane Hospital to Kedron via the Lutwyche Road corridor. The busway will be underground between Truro Street, Windsor and Sadlier Street, Kedron, surfacing at the two new busway stations situated at Lutwyche and Kedron.
The Windsor to Kedron section of the Northern Busway will be constructed together with Airport Link. The Northern Busway (Windsor to Kedron) will connect with the existing Inner Northern Busway at the Royal Brisbane & Women's Hospital, Herston to Kedron via the Lutwyche/Gympie Road corridor.
The busway will be underground between Truro Street, Windsor and Sadlier Street, Kedron, surfacing at two new, architecturally designed busway stations located at Lutwyche and Kedron Brook.
Yes buses will still be able to travel along the surface roads. For fast, frequent bus services connecting the city and northern suburbs, buses will use the Northern Busway between Windsor and Kedron. More details on bus services and stops will be provided by TransLink closer to the opening of the new busway at www.translink.com.au/northernbusway
No. The Airport Link toll road will be for motorists only. Buses will use the Northern Busway tunnel.
Once construction has been completed, the Northern Busway (Windsor to Kedron) will be handed over to the State Government for TransLink to operate and maintain. Prior to the opening of the Northern Busway (Windsor to Kedron) TransLink’s network planners will review local bus services to reliability and faster travel times offered by the new busway.
This is the Northern Busway stage one (RBWH Busway Station). Thiess John Holland is currently constructing stage two of the Northern Busway, connecting the RBWH at Windsor and extend to Kedron via the Lutwyche Road and Gympie Road corridor.
If you would like information furthern information on the Northern Busway (stage one) which is now open, visit www.translink.com.au/northernbusway.
Thiess John Holland is working with the Brisbane Metropolitan Transport Management Centre, the Department of Main Roads, TransLink and Brisbane City Council to ensure traffic management is coordinated throughout construction of these critical projects.
Thiess John Holland will conduct regular traffic analysis and time travel surveys to ensure traffic flow and capacity is maintained.
To facilitate construction of the projects, changes to the existing traffic conditions will be necessary to ensure traffic flow is maintained.
Road users will receive advance notification of changed traffic conditions via electronic message signs, local letterbox drops, the project website www.brisconnections.com.au or by contacting the 24 hour Community Hotline on 1800 721 783 (freecall). Major traffic changes will be advertised in local newspapers or The Courier Mail.
You can also sign up to receive SMS project traffic alerts via the project website www.brisconnections.com.au.
Temporary changes to the road network and traffic movements will be required throughout the projects’ construction and will be submitted to Brisbane City Council and the Department of Main Roads for review and approval prior to implementation.
Planning for construction and traffic management is designed to minimise impacts to traffic flow. Detailed traffic management plans will ensure there are minimal impacts on traffic during construction.
Based on the findings of the project’s Environmental Impact Statement, increased vehicle movements on local roads are not anticipated as a direct result of Airport Link.
The free-flow toll road will make the journey to and from the city safer, less congested and faster with less stopping and starting, thus improving the living environment in adjacent suburbs.
All construction sites generate dust and noise. However environmental performance for the project is monitored constantly, particularly dust, noise and vibration. Strategies implemented to reduce these impacts on-site and in neighbouring areas include:
Despite all efforts to minimise construction impacts through design and the measures above, there may be some situations where certain individuals are exposed to high levels of ongoing disruption.
Any properties identified as being in this situation will be investigated on an individual basis to ensure the project meets the reasonable needs of the resident.
Depending on the situation with the property, monitoring will be undertaken to establish whether the noise, dust and vibration goals, as set by the coordinator general, are being exceeded. the project may offer mitigation measures that are reasonable and practical to mitigate impacts from construction.
A combination of tunnelling techniques were used to construct the Airport Link and Northern Busway tunnels:
Tunnel Boring Machines (TBMs) – two TBMs were launched from the Toombul precinct and headed west towards Lutwyche to construct a circular tunnel profile which will accommodate a two-lane road tunnel.
Roadheader Machines – eleven Roadheaders were used to excavate the varied tunnel shapes needed for ramps, merging areas, egress passages and breakdown lanes.
Cut and cover – this construction technique was used for tunnel work closer to the surface. Cut and cover tunnels are formed by excavating a trench from the surface, constructing a tunnel within it, then backfilling the trench. Surface work, including the construction of roads, can then be carried out above the tunnel.
The tunnelling techniques chosen will deliver the projects ahead of the Government’s original schedule, and with less impact on traffic, the community and the environment. Extensive tunnelling by roadheader and TBM reduces the amount of cut and cover surface work undertaken by the project.
Tunnelling activities, at times, under particular conditions, generate some regenerated noise. Regenerated noise occurs when vibration from tunnelling activities travels through the ground, into the foundation of the building and vibrates the flat surfaces, creating an audible noise.
The target goal for regenerated noise during tunnelling is 45 decibels, which is similar to the noise generated from a quiet office.
Vibrations are commonly experienced during construction. However the levels vary according to the depth of tunnelling and the surrounding environment. As a standard measure, the project will continue to conduct condition surveys where required, on directly affected properties along the project alignment.
Extensive noise and vibration modelling has been conducted along the tunnel alignment to predict likely noise and vibration impacts. During tunnelling, noise and vibration monitoring was undertaken to ensure noise and vibration was in line with anticipated levels.
These results are published each month on the Environment section of this website
As much excavated material as possible will be re-used as backfill in the construction of the cut and cover tunnels, retaining walls and other earth works structures for Airport Link. Spoil that is not re-used will be transported via haulage truck or a conveyor system to designated fill sites across South-East Queensland, which have been identified for future commercial development.
In accordance with the State Government’s spoil management and transport conditions, trucks will operate 24 hours per day, six days per week between 6.30am Mondays and 6.30pm Saturdays.
Residents will be advised prior to the commencement of 24 hour spoil haulage operations.Spoil haulage trucks will use the most direct route to arterial roads from each construction site which will involve the use of some local roads.
Spoil haulage trucks will be clearly identifiable with the Airport Link project to assist the project with the management of trucks.
There are three ventilation station outlets (VSO’s) located across the project alignment:
Bowen Hills – the ventilation station is below ground near Mann Park, allowing for provision of a landbridge and enhanced pedestrian connectivity.
Kedron – the ventilation station is above ground and located behind the Emergency Services complex.
Toombul – the ventilation station is below ground, allowing for provision of a new pathway and parkland connection for the community. The ventilation outlet will feature subdued night lighting, and is positioned with the slim side facing residents in a way that reduces shadowing during the day.
Air quality will be monitored constantly during construction with results published monthly on the Environment page of this website.
Mitigation methods such as the following are undertaken at all sites during construction to reduce dust impacts on the surrounding community:
Thiess John Holland is contracted to construct the project as per the existing design and project scope provided by the State Government. Any variations to the existing design or project scope will be determined by the State in consultation with the relevant transport authority.