Bowen Hills

The Bowen Hills precinct represents the southern or ‘city’ connection to the Airport Link and Northern Busway projects.

The Northern Busway (Windsor to Kedron) will connect with the recently opened Northern Busway Stage 1 near the Royal Brisbane & Women’s Hospital, via an adjoining bridge structure crossing  Breakfast Creek and Bowen Bridge Road before merging onto the existing Lutwyche Road alignment and extending to Kedron.

An integrated network of roads and bridges will enable the Inner City Bypass, CLEM7 and local road network in Bowen Hills to connect with the Airport Link tunnel.

Community Notices

Type of work Commencing
Commissioning of Bowen Hills Ventilation Station February 2012
February Construction and Night Works Update February 2012
Cartwright Street- Air Quality Monitoring Station Update 31 January 2012
Bowen Hills - Hill top and Mann Park fact sheet September 2011

Traffic changes

Click here for information on traffic changes in the Bowen Hills precinct.

Construction in Bowen Hills

Three key work sites have been established in the Bowen Hills precinct to enable construction of Airport Link and Northern Busway (Windsor to Kedron): Federation Street; Northey Street; and the southern side of Enoggera Creek.

Key construction activities to be undertaken in the Bowen Hills precinct up to 2012 include:

  • 24 hour roadheader tunnelling from the Federation St site, Bowen Hills to excavate the north and southbound Airport Link tunnels up to Constitution Road, Windsor
  • Airport Link entry/exit for Bowen Hills, including construction of the southbound Lutwyche Road off-ramp
  • Construction of 12 bridges in total - for the Airport Link road and Northern Busway
  • Road bridges to connect the Airport Link tunnel with the Inner City Bypass, CLEM7 tunnel, Bowen Bridge Road, Lutwyche Road and Campbell Street in Bowen Hills
  • Stage two of the Northern Busway - including the busway bridge linking the Northern Busway Stage 1 (RCH to Windsor) at Bowen Bridge Road, with the new bus stop at Federation Street, before merging with Lutwyche Road
  • Construction of a ventilation station and outlet for the Airport Link tunnel

Bowen Hills Community Liaison Group (CLG)

CLGs have been formed in all major precincts, to represent the local community by communicating ideas and concerns to the project team and the State Government during design and construction - Go to the Bowen Hills CLG page

What will Bowen Hills look like in 2012?

Visit the Design page to see the urban design for the Bowen Hills precinct of the project.