Kedron precinct

The Kedron precinct provides the northern suburbs’ connection to both the Airport Link toll road and the Northern Busway. Throughout construction, Kedron will be a hub of activity as it falls at the centre of the project’s alignment.

Major surface works, construction of four new bridges and tunnelling will be undertaken to connect the local road network at Gympie and Stafford Roads to the Airport Link tunnel. The new Kedron Brook Busway Station (opposite the Emergency Services Complex) will also be incorporate a kiss 'n' ride and enhanced pathway connections. 

The Airport Link Operations Centre (ALOC), to be built at the corner of Stafford and Gympie Roads in 2010, will incorporate the Tollroad Control Centre providing 24-hour surveillance and safe operation of the Airport Link toll road. 

Community Notices
View notifications for current/upcoming construction work and traffic changes in the Kedron precinct:

Type of work Commencing
Lutwyche Road Service Investigation 18 March
Gympie Road Realignment 22 March
Kedron South March Construction Update
Kedron North March Construction Update
Services Relocation Works- Update
Spoil Haulage 8 March
Services Relocation Works- Update
Electrical Relocation Works- Update 26 February
Night Works- Final Concrete Pour 25 February
February Precinct Update
Service Relocation Works- Update 21 Jan - 4 March

Traffic Changes- Lutwyche Rd

27 February
Stormwater Works 9 February
Night Works 8 February 2010
Arnott Street Closure Mid February 2010
Tunnelling Works February 2010
Services Relcoation Works 21 Jan -
4 March
Telecommunication Relocation 18 Jan

Vegetation Removal
27 - 31 Jan

Temporary road closure - Swan Street

11 Jan 2010
Site Establishment Works - Kedron Park Hotel Mid Jan 2010 - ongoing
Revised - Road Closure Rose Lane 13 Dec 2009 -
Revised - Kedron Water Relocations 18 Dec 2009 - ongoing
Kedron South Construction Update Dec 2009
December Construction Update Dec 2009
Northern Busway Construction Dec 2009 - Jun 2012
Night Works Update - Gympie Road Realignment 30 Nov - 4 Dec
Energex Works 2 Dec 2009 - 10 Feb 2010
Gympie Rd site construction update - Closure of Lasseter St and Gympie Rd worksite update 8 July 2009 - June 2012

 Please note: the below notices apply to all precincts along the project alignment.

Type of work Commencing
Groundwater monitoring March 2009 - ongoing
Condition surveys
ongoing

Pathway Notices

The Kedron Brook Pathway will be diverted to the northern bank from 3 December 2009. Access to Gympie Road and the inbound, Kedron Brook bus stop will be via the northern bank.
Click here to view map.


The Stafford Road footpath is closed. Pedestrians will detour via Brookfield Road.

The Gympie Road
signalised crossing from Leckie Road to Broughton
Road is closed. Pedestrians will detour via the signalised crossing at the Gympie Rd / Stafford Rd intersection or the Gympie Rd / Sadlier St intersection.
Click here to view map.

The Gympie Road western path will close from 4 December 2009. Pedestrians will detour via the eastern footpath accessible at the Stafford Road and Sadlier Street signalised intersections.

Somerset Road and Broughton Road will close to pedestrians from 4 December 2009. Pedestrians will detour via Nieppe Street and Cremorne Road, and/or Mitchell Street and Clarence Road and Homebush Road.

The old Perry Street footpath is closed. Pedestrians to detour via Lutwyche Road and Norman Avenue.

Kedron Brook Dog Off-Leash Area is closed between Amelia Park and Lasseter St, Kedron.
Pedestrians and pets to detour via Kedron Brook pathway.

Kedron Brook Pathway has a minor diversion in place via a new sealed path approximately 100 metres east of the Gympie Rd overpass.


Construction in Kedron
Seven key work sites have been established in the Kedron precinct enabling construction of Airport Link and Northern Busway: Stafford Road; Gympie Road east; Gympie Road west; Kedron Brook; Perry Street; Kedron Brook Building site; and Lutwyche Road.

Key construction activities to be undertaken in the Kedron precinct up to 2012 include:

  • Construction of the Airport Link westbound off-ramp (for motorists travelling from Toombul and exiting at Gympie / Stafford Roads) and northbound off-ramp (for motorists travelling from Brisbane city and exiting at Gympie / Stafford Roads)
  • Two new overpass bridges, connecting with the westbound and northbound off-ramps, enabling motorists to exit the Airport Link tunnel at Kedron and continue onto Gympie / Stafford Roads
  • Construction of the southbound and eastbound on-ramps (for motorists travelling from Stafford / Gympie Roads to Brisbane city and the airport)
  • New Gympie Road carriageway bridge to replace the existing bridge over Kedron Brook
  • Construction of new Gympie Road  - allowing the Gympie Road carriageway to be shifted east (from Kedron Brook to Arnott Street)
  • Traffic diversion onto the new Gympie Road carriageway and bridge over Kedron Brook; demolition of existing Kedron Brook bridge
  • Construction of the Northern Busway, including the Kedron Brook Busway Station a bridge over Kedron Brook and tunnel construction along the western side of Gympie Road, surfacing past Somerset Road
  • Construction of the ventilation station and outlet behind the Emergency Services Complex
  • Airport Link Operations Centre situated at the corner of Cremorne Road / Stafford Road / Gympie Road
  • Re-instatement and upgrade to the Kedron Brook following completion of construction

What will Kedron look like in 2012?
> Visit the Design page to see the urban design for Kedron precinct

Kedron Community Liaison Group (CLG)
CLGs have been formed in all major precincts of the project to represent the local community by communicating ideas and concerns to the project team and the State Government during design and construction of the project > Go to the Kedron CLG page






 