Kedron precinct
The Kedron precinct provides the northern suburbs’ connection to both the Airport Link toll road and the Northern Busway. Throughout construction, Kedron will be a hub of activity as it falls at the centre of the project’s alignment.
Major surface works, construction of four new bridges and tunnelling will be undertaken to connect the local road network at Gympie and Stafford Roads to the Airport Link tunnel. The new Kedron Brook Busway Station (opposite the Emergency Services Complex) will also be incorporate a kiss 'n' ride and enhanced pathway connections.
The Airport Link Operations Centre (ALOC), to be built at the corner of Stafford and Gympie Roads in 2010, will incorporate the Tollroad Control Centre providing 24-hour surveillance and safe operation of the Airport Link toll road.
Community Notices
View notifications for current/upcoming construction work and traffic changes in the Kedron precinct:
Please note: the below notices apply to all precincts along the project alignment.
Pathway Notices
The Kedron Brook Pathway will be diverted to the northern bank from 3 December 2009. Access to Gympie Road and the inbound, Kedron Brook bus stop will be via the northern bank.
Click here to view map.
The Stafford Road footpath is closed. Pedestrians will detour via Brookfield Road.
The Gympie Road signalised crossing from Leckie Road to Broughton Road is closed. Pedestrians will detour via the signalised crossing at the Gympie Rd / Stafford Rd intersection or the Gympie Rd / Sadlier St intersection.
Click here to view map.
The Gympie Road western path will close from 4 December 2009. Pedestrians will detour via the eastern footpath accessible at the Stafford Road and Sadlier Street signalised intersections.
Somerset Road and Broughton Road will close to pedestrians from 4 December 2009. Pedestrians will detour via Nieppe Street and Cremorne Road,
and/or Mitchell Street and Clarence Road and Homebush Road.
The old Perry Street footpath is closed. Pedestrians to detour via Lutwyche Road and Norman Avenue.
Kedron Brook Dog Off-Leash Area is closed between Amelia Park and Lasseter St, Kedron.
Pedestrians and pets to detour via Kedron Brook pathway.
Kedron Brook Pathway has a minor diversion in place via a new sealed path approximately 100 metres east of the Gympie Rd overpass.
Construction in Kedron
Seven key work sites have been established in the Kedron precinct enabling construction of Airport Link and Northern Busway: Stafford Road; Gympie Road east; Gympie Road west; Kedron Brook; Perry Street; Kedron Brook Building site; and Lutwyche Road.
Key construction activities to be undertaken in the Kedron precinct up to 2012 include:
- Construction of the Airport Link westbound off-ramp (for motorists travelling from Toombul and exiting at Gympie / Stafford Roads) and northbound off-ramp (for motorists travelling from Brisbane city and exiting at Gympie / Stafford Roads)
- Two new overpass bridges, connecting with the westbound and northbound off-ramps, enabling motorists to exit the Airport Link tunnel at Kedron and continue onto Gympie / Stafford Roads
- Construction of the southbound and eastbound on-ramps (for motorists travelling from Stafford / Gympie Roads to Brisbane city and the airport)
New Gympie Road carriageway bridge to replace the existing bridge over Kedron Brook
Construction of new Gympie Road - allowing the Gympie Road carriageway to be shifted east (from Kedron Brook to Arnott Street)
Traffic diversion onto the new Gympie Road carriageway and bridge over Kedron Brook; demolition of existing Kedron Brook bridge
Construction of the Northern Busway, including the Kedron Brook Busway Station a bridge over Kedron Brook and tunnel construction along the western side of Gympie Road, surfacing past Somerset Road
Construction of the ventilation station and outlet behind the Emergency Services Complex
Airport Link Operations Centre situated at the corner of Cremorne Road / Stafford Road / Gympie Road
Re-instatement and upgrade to the Kedron Brook following completion of construction
What will Kedron look like in 2012?
> Visit the Design page to see the urban design for Kedron precinct
Kedron Community Liaison Group (CLG)
CLGs have been formed in all major precincts of the project to represent the local community by communicating ideas and concerns to the project team and the State Government during design and construction of the project > Go to the Kedron CLG page